Najat Aya: part of the climate-neutral steel production team

Career at thyssenkrupp | Engineering | People at thyssenkrupp | Smart energy | Sustainability and climate protection | It’s an ambitious goal: thyssenkrupp aims to be completely climate-neutral by 2050. For energy-intensive steel production in particular this means nothing less than a radical change in production processes. One engineer working on the future of steel production is Najat Aya.

thyssenkrupp is working flat out to achieve the goal of climate neutrality. For steel production this is a truly Herculean task. The burning of carbon in steel production generates large amounts of carbon dioxide: In conventional blast furnaces, carbon is burned to reduce the oxygen contained in the iron ore raw material. The process produces not only pig iron, which is then further processed into steel, but also CO2.

Climate-neutral steel production by 2050

thyssenkrupp is pursuing two main approaches to reducing these unwanted CO2 emissions: The “Carbon2Chem” project aims to convert steel mill emissions, including the CO2 they contain, into valuable chemicals for further use. The technology is expected to be available on a commercial scale as early as 2025.

The second approach relies on hydrogen, as Najat Aya explains: “In order to avoid CO2 emissions, the plan is to use hydrogen as a reducing agent in the blast furnace instead of carbon. The advantage is that using hydrogen produces water vapor, whereas with coal you’re producing CO2”. It sounds simple, but of course it’s not. The processes are complex: “Using hydrogen in the blast furnace also changes the proportion of hydrogen in the blast furnace gas, which is a by-product of the blast furnace process,” reveals Najat. “We use this blast furnace gas and will continue to do so, so it’s important to know how the changed composition affects our processes.”

Internship, dissertation, trainee program

Najat Aya should know. A graduate of Duisburg-Essen university, Najat is a trainee in the energy management and process engineering/process control department at thyssenkrupp Steel Europe AG researching the use of hydrogen in steel production. The 26-year-old joined thyssenkrupp Steel Europe in Duisburg in April 2017, initially on a three-month internship as part of the seventh and final semester of her mechanical engineering course, in which she specialized in energy and process engineering.

“Three months turned into three years,” laughs Najat. “After the internship, thyssenkrupp offered me the opportunity to work with them writing my bachelor’s dissertation.” Afterwards she took a master’s degree, which thyssenkrupp supported with a scholarship. Najat also wrote her master’s thesis at thyssenkrupp. In it, she dealt intensively with cowpers for the first time. Cowpers are hot blast stoves which are used in steel production to supply a blast of oxygen at over 1,000°C for combustion in the blast furnaces.

Najat began her traineeship at thyssenkrupp Steel Europe in the month she graduated. Her experience with cowpers quickly came in handy. “To bring the cowpers to the desired temperature, several aspects have to be taken into account, for example, the tendency of the cowpers to pulsate,” reveals the young engineer. “By studying the combustion process inside the cowpers and making a mixed gas analysis, we discovered that additional hydrogen should not be fed into the cowpers. The blast furnace gas with the higher hydrogen content is therefore supplied to our power plants. The cowpers, on the other hand, are supplied with gas from other blast furnaces.”

“We’re on the right track”

Najat has no doubt that steel production will be CO2-neutral by 2050. “We have to consider many aspects in order for steel to become climate-neutral,” she concedes, “but we’re definitely on the right track.”

When Najat talks about her job, she often uses the word “we”. As a team player, she appreciates the value of effective teamwork: “Once you become part of a team, you quickly realize that a smart team is always better than a single genius. Together, not only can you achieve much more, you get there faster.”

There’s no such thing as a “typical” working day for Najat. “Our work is incredibly varied. For example, we support our hot-dip coating lines. When it comes to control or furnace optimization models, our team comes into play. We also provide support for many process engineering tasks. We can also assist when it comes to fluid dynamics analyses. Among other things, we carry out numerical flow simulations in order to better understand processes within the production units and optimize the various processes.”

A “cool job”

Even as a child Najat knew she would be an engineer one day. “I didn’t have a clear idea of what branch of engineering I would choose or what industry I would work in. But I knew that I would have a cool job and I was right.”

Leave a Reply

Your email address will not be published. Required fields are marked *

Related articels

engineering together
Career at thyssenkrupp | Digitalisation and industry 4.0 | Engineering | innovation | People at thyssenkrupp | thyssenkrupp worldwide | Edgar Tan has a passion for engineering and is excited about the possibilities of additive manufacturing. Since October 2019 the 32-year-old has been supporting thyssenkrupp Innovations in Singapore in the development of new production processes.
together
Career at thyssenkrupp | People at thyssenkrupp | thyssenkrupp worldwide | Work safety | Brittany McGrath is fascinated by technical issues. She is also interested in the policy and legal aspects of safety and environmental work. Brittany combined both backgrounds and found her professional fulfillment in occupational safety and health at thyssenkrupp North America. For Brittany, it is an interesting mix. “You need to understand the technical aspects as well as the policies to address safety and environmental challenges.”
together
Apprenticeship at thyssenkrupp | Career at thyssenkrupp | People at thyssenkrupp | The civil war in Syria has led to the biggest refugee crisis in the last 30 years: Roughly 11.6 million Syrians were on the move in 2015, and at least five million people fled their homeland. Ali Ali was one of them. He came to Germany in 2015 and now, five years later, he has successfully completed an apprenticeship with thyssenkrupp Materials Services.
engineering together
Career at thyssenkrupp | Engineering | People at thyssenkrupp | thyssenkrupp worldwide | Under an order for the Hungarian MOL Group, thyssenkrupp Industrial Solutions is building a vast chemical complex in Tiszaújváros, Hungary, 160 kilometers east of the capital Budapest. Scheduled to start operation in 2021, the plant will produce around 200,000 tons of polyols annually. It’s not just the size of the complex that makes it unique in the region. It will also set new standards in terms of efficiency, eco-friendliness, and automation. Nine months after the foundation stone laying, the project is well on track despite the impact of the coronavirus crisis. Katarina Letkova and Tomasz Morawski are two of the employees making this gigantic project a success.